Bromley house

rastreetjpg

With an existing consent as a starting point, we developed the design into something simpler and more elegant. 

From an initial notion to 'future-proof' the attic for future conversion, came a fully worked out second storey that was constructed along with the rest of the house.

rasectsmjpg
The specification reflects a wish for energy efficiency but not Passivhaus certification. However, the structure by Touchwood Homes is so airtight, the building is probably certifiable, and is in process of being certified.

The build was managed by the Clients.